Proven in the field.

Over the years Exquis has built a broad, solid base of core competencies, executing solutions recommended by international standards with up-to-date technology. From equipment to new trends, we stay current so our industry partners get the quality they need.

  • Transformers
  • Switchgear
  • Substations
  • Battery storage
  • Solar
Exquis engineers in hard hats working at the high-voltage bushings of a power transformer
Our engineers at the bushings of a substation power transformer.

From fault to reliability: arcing on a power transformer at a battery storage facility.

Rating
30 MVA
Voltage
69/13.8 kV
Site
BESS facility
T-01 · 30 MVA · 69/13.8 kV Arcing observed 1 2 3 4 5 6 7 8 8 tests performed Loose primary bushing terminal No internal fault Cleaned · new hardware Re-torqued to spec Normal after energization

Step 01 / 05Observation

  1. 1Observation

    Arcing at a 30 MVA transformer.

    Electrical arcing was observed on a 30 MVA, 69/13.8 kV power transformer at a battery energy storage facility. In a BESS environment, an unexplained arc is a risk to the whole site, so the question was urgent: is the transformer itself failing?

    High-voltage bushings on the transformer at the BESS facility
  2. 2Our approach

    A systematic diagnostic methodology.

    Rather than guess, our engineers worked through the asset one test at a time.

    • Visual inspection
    • Insulation power factor
    • Capacitance & hot collar
    • Transformer turns ratio
    • Excitation current
    • Winding resistance
    • Core & tank grounding
    • Insulating oil breakdown voltage
    Exquis engineer running diagnostic tests from a test set
  3. 3Finding

    The transformer was healthy.

    The results confirmed the transformer was in good condition, with no internal faults detected. The arcing was traced to a loose mechanical connection at the primary bushing terminal, not an internal defect.

    Bushings and terminal connections against the sky
  4. 4Solution

    Corrective maintenance.

    Contact surfaces were cleaned, bolts and nuts were replaced with corrosion-resistant hardware, and the connection was re-torqued to specification.

  5. 5Outcome

    Verified, safely back in service.

    Post-energization thermography confirmed normal operation. Through proper diagnostics and timely corrective action, the issue was safely resolved, showing how accurate assessment and proper installation prevent major failures.

    Exquis engineer checking the energized installation at night

Case study library.

The full reports behind our field work, with test results, findings and recommendations. Request a report and our team will send you a download link once it's approved.

Cover of the case study: From Fault to Reliability, diagnostic analysis of electrical arcing in a 30 MVA transformer

From fault to reliability: arcing on a 30 MVA power transformer

Case study. 8-page PDF.

A diagnostic analysis of electrical arcing on a 30 MVA, 69/13.8 kV transformer at a battery energy storage facility, from the first observation to verified, safe operation.

  • The eight diagnostic tests we ran, and why.
  • What the results showed, and what they ruled out.
  • The corrective work and how it was verified.

We review each request and email the link once it's approved.

More case studies are being prepared and will be added here.

Beyond the Project.

Engineering Insights. Proven Solutions.

Join Engr. Juan Paolo M. Tolentino as he takes you through actual Exquis engineering projects, presenting the complete project story from objectives and failure assessments to technical interventions, services delivered, and final outcomes. Discover the engineering decisions, diagnostic approaches, and technical expertise behind every project.

Real projects. Technical insights. Engineering expertise in practice.

    1 of 3

    Work that keeps the lights on.

    A selection of recent assignments across monitoring, studies, maintenance and commissioning, photographed by our own field teams.

    1. Condition monitoring

      Dynamic Ratings bushing & partial discharge monitoring

      Advanced monitoring solutions for assessing bushing condition, detecting partial discharge activity, and supporting reliable transformer operation.

      Engineer working at a transformer bushing
      Configured bushing health monitor inside a cabinet
      Engineer fitting a sensor at the bushing

      Configuration of a DTM bushing health monitor.

    2. Studies & safety

      Power system analysis & evaluation, power quality & harmonics analysis

      Arc-flash labels applied based on the power system analysis results, giving essential safety information and supporting safer electrical system operation.

      Engineer applying an arc-flash label to an electrical panel
      Engineer in high-visibility vest at a panel
      Engineer labelling switchgear

      Arc-flash labels applied from the power system analysis.

    3. Batangas · Electric cooperative

      Preventive maintenance of 10 MVA substations

      Comprehensive preventive maintenance to assess equipment condition, ensure reliable substation performance, and help prevent electrical faults and unplanned downtime.

      Crew working on top of a substation transformer
      Substation transformer during maintenance
      Engineer taking an oil sample from a transformer

      Preventive maintenance at a 10 MVA substation.

    4. Nueva Ecija · Solar & battery storage

      Testing & commissioning of power transformers at MTerra Solar

      Testing and commissioning of 230 kV and 500 kV power transformers, verifying performance, operational readiness and compliance with required electrical standards before energization.

      Crew on top of a large power transformer at a solar facility
      Engineer operating a transformer test set
      Engineers at the transformer during commissioning

      Testing and commissioning of power transformers.

    5. Limay · Lamao · Kabankalan · Battery storage

      Emergency response at SMGP battery energy storage sites

      Rapid emergency response across several Battery Energy Storage System (BESS) sites for San Miguel Global Power, including Limay, Lamao and Kabankalan. In high-risk, time-critical situations, our team mobilized immediately to address the emergency conditions, run diagnostics and carry out corrective actions.

      These interventions helped prevent potentially catastrophic incidents and reduced operational risk and capital losses.

      A line-up of medium-voltage switchgear in an equipment room
      An outdoor high-voltage substation yard under a clear sky

      A switchgear room and a substation yard.

    6. Ilocos Norte · Solar

      Testing & evaluation of a 75 MVA power transformer

      Comprehensive testing and commissioning activities to verify transformer performance, operational readiness and compliance with required electrical standards before energization.

      Exquis crew in a solar farm substation yard
      Engineer running tests from a laptop on site
      75 MVA power transformer at the solar substation

      Testing and commissioning of a 75 MVA power transformer.

    Our teams at work.

    From the field, filtered by the equipment we were working on.

    Technician reaching into a switchgear breaker cubicle
    Breaker cubicle service
    Power transformer bushings and piping
    Power transformer
    Contact resistance tester in use
    Contact resistance test
    Two Exquis engineers in hard hats inside a substation
    Indoor substation
    Engineer measuring current at a panel
    Panel measurements
    Crew testing a large outdoor power transformer
    Outdoor transformer testing
    Two engineers working at switchgear
    Switchgear maintenance
    Monitoring cabinet with an industrial PC and laptop
    Monitoring cabinet
    Engineers at a transformer control cabinet
    Transformer controls
    Exquis uniform with embroidered logo and a white hard hat
    The Exquis uniform
    Engineer in a switchgear room
    Switchgear room
    Exquis engineer walking a hillside solar site
    Solar site walk
    Outdoor power transformer
    Substation transformer
    Engineer testing at a control panel
    Control panel testing
    Engineers inside a substation
    Substation works
    Engineer at a monitoring cabinet
    Monitor configuration