Our Projects

Over the past decades, Exquis Engineering has developed a broad and solid spectrum of core competencies, which today built the foundation of the company's offering and success. Being at the forefront of the field, Exquis Engineering offers and executes solutions that are recommended by international standards and up to date technology.

 

From equipment to new trends, Exquis Engineering ensures that it is up to date to provide the highest quality its industry partner needs.

Diagnostic Analysis of an Observed Electrical Arcing in a 30 MVA, 69/13.8 kV Power Transformer in a BESS Facility

photos.png

The transformer was confirmed to be in good condition, with no internal faults detected. The electrical arcing was traced from a loose mechanical connection at the bushing terminal, not an internal defect.

Through proper diagnostics and timely corrective action, the issue was safely resolved highlighting the importance of accurate assessment and proper installation in preventing major failures.

PROBLEM: A loose primary bushing terminal connection

OUR APPROACH :  Systematic diagnostic methodology was implemented

SOLUTION:  Corrective maintenance activities

PROJECT HIGHLIGHTS 


CONFIGURATION OF DTM BUSHING HEALTH MONITOR

Dynamic Ratings Bushing
& Partial Discharge Monitoring

image.png
image.png
image.png
image.png

Advanced monitoring solutions for assessing bushing condition, detecting partial discharge activity, and supporting reliable transformer operation.

Power System Analysis & Evaluation /
Power Quality & Harmonics Analysis

image.png
image.png
image.png

Application of Arc Flash labels based on power system analysis results to provide essential safety information and support safer electrical system operation.

POWER SYSTEM ANALYSIS APPLICATION OF ARC FLASH STICKER

Preventive Maintenance of 10 MVA Substations for an Electric
Cooperative in Batangas Philippines

image.png
image.png
image.png
image.png

Comprehensive preventive maintenance activities to assess equipment condition, ensure reliable substation performance, and help prevent potential electrical faults and unplanned downtime.

PREVENTIVE MAINTENANCE 

Testing and Commissioning of

10 units 333MVA Power Transformer

at TERRA Solar Farm in Nueva Ecija

image.png
image.png
image.png
image.png

Comprehensive testing and commissioning activities to verify transformer performance, operational readiness, and compliance with required electrical standards before energization.

TESTING AND COMMISSIONING OF 4 Units - 260 MVA POWER TRANSFORMER

Testing and Evaluation of 75MVA

Power Transformer at Solar Power

Farm in Ilocos Norte

image.png
image.png
image.png
image.png

Comprehensive testing and commissioning activities to verify transformer performance, operational readiness, and compliance with required electrical standards before energization.

 TESTING AND COMMISSIONING OF 75 MVA POWER TRANSFORMER

629998106_1603264334206343_1483753848046888600_n.jpg
exquis electrical engineer 7.png
638319618_1405240330768270_2812447850136013523_n.jpg
607276741_876706314727874_2667398490694386073_n.jpg
633952701_786944884452041_1964514615808892113_n.jpg
645126816_4187143841596395_2258283835658952096_n.jpg
604663215_861078960118994_4354993103917501403_n.jpg
exquis electrical engineer 5.png
645539365_1231453655769846_6718840728039627880_n.jpg
  • alt.text.label.Facebook
  • alt.text.label.LinkedIn

©2022 by Exquis Engineering.

bottom of page